Welcome aboard samtee!
As of the car, definatly not my taste and something I would never consider. But somehow it does work..
The pictures we have of #108 are 2 weeks old so it should be pretty much assembled as of now, #107 probally ready for delivery very soon.
The BHP Project are taking delivery late 2014/early 2015, their car should be #5/6, probally #111. Now that means that #108, #109, #110 and #111 are going to be finished within 3-4 months. So as of Guangzhou, I think both #108 and #109 are good candidates.
From my understanding regular Ageras will be built inbetween the One:1 chassis, and obviously there doesn't seem to be any room before TBP are taking delivery. So I think #106-#111 are going to be One:1s, then at least 1 Agera in between and then One:1 #6 for the U.S. They need to have at least 1 MY15 Agera for Geneva in March, although it doesn't mean that it has to be a finished car though like #100 that was shown way before it was done.
Any thoughts?
re J_C: Hahaha i drew it in MS Paint on the mousepad on my laptop, not ideal for trying to make detailed renderings, but I think it serves the purpose i intended for it at least